Dear sir, 
This is the 
" power of hybrid cascading hydro power generation" in which the three proved technologies are amalgamated to form one individual hybrid , example : water is pumped inside the very first reservoir 
"160 meters inlet 1000 meters body and 20 meters outlet "
is the very first reservoir.

The very first reservoir acts as a dam to store water and make a 160 meters head.    

When water is released inside the second reservoir the power house situated in between the first out let and the second inlet will generate electricity.

When the water is released from the 25th reservoir the tail pond water is once again made to run back 25 kilometers and run of the river technology is used to make the flowing water to pass through low head DARRIEUS type hydro turbine and electricity can be generated there after when the flowing water reaches the very first reservoir then water is pumped into the very first reservoir situated at 170 meters.  

With regards
C.S.BHASKAR

Example of 700 MW pump storage hydro power generation:

P = Head 160 (m) X Flow 42000 (m3/sec) X Gravity 9.81 X efficiency 40%.
  

Power (kW): 26369280 

IS THE POWER GENERATED EVERY HOUR BY USING 42000 CUBIC METERS OF WATER PER SECOND WITH 160 METERS HEAD.
—————–,.———————,.

Pump Consumption Electricity.

42000 M3/Sec X 3600 Seconds = 151200000 m3/hr

Hydraulic Power: 66335220 (kW) 88955530.02 (bhp)

Shaft Power: 110558700 (kW) 148259216.7 (bph)

“The power generated is not of any use” because the Pump electrical consumption is grater than the generation.
——————–,.———————–——,.—————–,.
The fact of the reservoir technology.

The first China-made 700,000-kw OR 700 MW Turbine Generator began operating at the Three Gorges Dam.

  In trial operation, the 50-meter high, 7,000-ton super-large generator achieved its 756 MW capacity is seen in the Reservoir Technology.


BOTH ARE A BIG FAILURE.



But from USING Multi Cascading technology, the power generated will be much more than pump consumption.

“Kindly understand what is happening to the water after the tail release for pump storage and in reservoir technology.”

(1) In pump storage water is made to run from a pen stock from 160 meters into the turbine and the tail release water is collected inside the tail pond there ends the kinetic energy of the running water and once again the water will be having potential energy.

(2) In the Reservoir technology the Dam is having potential water and this potential water is made to run through a pen stock to rotate the turbine and the tail release water is sent inside the normal flowing river then also the water will not be of further use because the water is just flowing with little head.

In HYBRID Cascading Hydro power generation there will be a pipe of 160 meters in diameter placed in a 25 kilometer fly over typeramp and this fly over is slantingly sloppily down INLET high 170 meters at the starting 1st kilometer & OUTLET at 25 kilometers will be to  the ground level.


The 160 diameters pipe will have a venturi effect there by for every one kilometer there will be a power generation power house.

THE 160 diameters 25 kilometer long single pipe will be coming down from 170 meters to zero meters or to ground level.

In between every one kilometer the 160 diameter pipe will become just 20 diameters acting as the outlet for the high pressure water pressure head of 42000 m3/sec to run inside the Turbine and 

P = H 160 (m) X F 42000 (m3/sec) X G 9.81 X e 40%.

Power (kW): 26369280 is generated per hour per each power house.
There by Constructing 25 power generation stations will generate  Power (kW): 26369280 X 25 = 659232000 (kw) per every one hour or 6,59,232. Mega Watts Per hour.
In this method just one reservoir or the very first reservoir is Completely filled 151200000 m3/hr and the rest of the reservoirs will get the water flowing down by the law of gravity on the slantingly sloppily down ramp from one reservoir tail release to fill another reservoir and after the following reservoir is completely filled then only the valves of the outlet are opened for the released water to impinge turbine after turbine in all 25 power generation power houses  and 24 reservoirs power generation is Free is myINNOVATION

  